Extend and Upgrade Floodway and Approaches (2019)

LOCATION: Stuart Highway CH1032.5

CLIENT: Department of Infrastructure Planning & Logistics

Construct and extend floodway and approaches of the existing floodway on the Stuart Highway at Ch1032.50 to alleviate flooding and assist the traveling public.

Works also included the construction of an 8m wide side track suitable for two-way traffic.

PLANT USED: Stabiliser, 160M Grader, body water carts and semi-water tankers, 962H Loader, multi/padfoot/smooth drum rollers, side tippers. Bitumen Sealing crew